Install highlights at Job 6118 |
|
Page:
1
2
3
4
5
6
|
-
This is what the cradle looks like up close. The unit is
sitting on a frame
constructed of lumber which sits in the emergency drain pan which
sits on
the cradle.
-
The unistrut is suspended with 3/8" diameter all-thread
which is bolted
to one of the roof supports.
-
Another shot of the Electronic Air Cleaner.
|
[ Prev ] [ Next ]
Back
Home
|